(Solved): 1 1 (3) Construct the Gantt chart for the activities in the table Activities Description Duration P ...
1 1 (3) Construct the Gantt chart for the activities in the table Activities Description Duration Precedence relation (month) A Do Preliminary market analysis B Do Preliminary product design 3 Begins where the Preliminary market analysis finish ? Do Preliminary Manufacturing Begins where the Preliminary market study analysis finish D Evaluate and select best product Begins where the Preliminary product design design finish E Do detailed marketing plans Begins where the evaluation and selection of best product design is complete F. Design Manufacturing process 3 Begins at the same time with developing the detailed marking plans G Develop detailed product design 3 Begins at the same time with developing the detailed marking plans H Build and test prototype Begins where developing the detailed product design is complete I Finalize product design 1.5 Begins where the build and test prototype is complete J Order components Begins where finalizing the product design is complete K Order production equipment 3 Begins at the same time with Ordering the components L Install production equipment 2 Begins where order production equipment is complete 1