(Solved): 6. (a) During a civil engineering construction work, it is planned to cut a 70 slope, 12m high ...



student submitted image, transcription available below
6. (a) During a civil engineering construction work, it is planned to cut a slope, high, measured vertically in soil having a unit weight of , with an effective cohesion of and an effective angle of friction of . Neglecting all possibility of seepage through the embankment, determine the factor of safety with respect to cohesion. (b) When will failure occur in a slope formed in a cohesionless soil and a cohesive soil?