A PHP Error was encountered

Severity: Warning

Message: fopen(/home/answnniz/solutionspile.com/system/sessions/ci_sessionc9d92ef58625bf63c81902e7def64ec5613a0659): failed to open stream: Disk quota exceeded

Filename: drivers/Session_files_driver.php

Line Number: 176

Backtrace:

File: /home/answnniz/solutionspile.com/index.php
Line: 367
Function: require_once

A PHP Error was encountered

Severity: Warning

Message: session_start(): Failed to read session data: user (path: /home/answnniz/solutionspile.com/system/sessions)

Filename: Session/Session.php

Line Number: 143

Backtrace:

File: /home/answnniz/solutionspile.com/index.php
Line: 367
Function: require_once

[Solved]: 6. (a) During a civil engineering construction wo
Home / Expert Answers / Civil Engineering / 6-a-during-a-civil-engineering-construction-work-it-is-planned-to-cut-a-70-slope-12m-high-pa142

(Solved): 6. (a) During a civil engineering construction work, it is planned to cut a 70 slope, 12m high ...



student submitted image, transcription available below
6. (a) During a civil engineering construction work, it is planned to cut a slope, high, measured vertically in soil having a unit weight of , with an effective cohesion of and an effective angle of friction of . Neglecting all possibility of seepage through the embankment, determine the factor of safety with respect to cohesion. (b) When will failure occur in a slope formed in a cohesionless soil and a cohesive soil?


We have an Answer from Expert

View Expert Answer

Expert Answer



We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe