(Solved): (a) Draw a project network. (Submit a file with a maximum size of 1MB. ) Choose File No file chosen ...



student submitted image, transcription available belowstudent submitted image, transcription available below
(a) Draw a project network. (Submit a file with a maximum size of . ) Choose File No file chosen (b) Identify the critical path. (Enter your answers as a comma-separated list.) (c) Develop the activity schedule for the project. project? The expected completion time is weeks, which is than 1 year.