Home / Expert Answers / Statistics and Probability / d-a-pilot-work-study-has-been-conducted-on-a-new-operation-with-four-work-elements-the-following-pa966

(Solved): D) A pilot work study has been conducted on a new operation with four work elements. The following ...



D) A pilot work study has been conducted on a new operation with four work elements. The following times, in seconds, were obtained using the continuous method. a. What is the normal time for this operation? (3 marks) b. If an allowance of 20 percent is used, what is the standard time for this task? (3 marks) c. What sample size is appropriate for estimating the time for element 3 within

+-3

percent of the true mean time with 95 percent confidence

(z=1.96)

? marks



We have an Answer from Expert

View Expert Answer

Expert Answer


We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe