Daher Corporation manufactures two products: Product A34R and Product E05V. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products A34R and E05V. Activity Cost PoolActivity MeasureTotal CostTotal ActivityMachiningMachine-hours$ 102,0005,000MHsMachine setupsNumber of setups$ 87,000200setupsProduct designNumber of products$ 103,0002productsOrder sizeDirect labor-hours$ 303,00010,000DLHs Activity MeasureProduct A34RProduct E05VMachine-hours2,7004,400Number of setups360190Number of products11Direct labor-hours5,1008,400 Required: What is the company's plantwide overhead rate? Using the plantwide overhead rate, how much manufacturing overhead cost would be allocated to Product E05V? Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product A34R?