Draw the lift elevation and draw the plan view by applying attached 9 step Procedure.
1- Add 20% to the total load
2- Identify the sling load = Load / Mode Factor (Mode Factor : 1)
3- Identify the sling length
4- Make the same units (Kgs or Tons)
5- Choose the lifting accessories
6- Add accessories to the load in step 4
7- Complete the drawings on graph paper of mm
8- Choose crane (add crane capacity (51.8t + Gross Wt 5.9 T)
9- Calculate Mat size and find actual ground bearing pressure