Home / Expert Answers / Civil Engineering / problem-a-rainfall-lasting-lhr-produced-a-runoff-hydrograph-from-a-10mi-2-drainage-basin-as-shown-pa354

(Solved): Problem: A rainfall lasting lhr produced a runoff hydrograph from a 10mi^(2) drainage basin as shown ...



Problem: A rainfall lasting lhr produced a runoff hydrograph from a

10mi^(2)

drainage basin as shown in the line labeled "Measured

Q^(inthefollowing)

table of computations. The discharge in cubic feet per sccond was measured at the beginning of each of twelve 4 hr time periods. At the beginning of the storm the base flow for the basin was 20 cfs . Determine the unit hydrograph of the basin for the storms. \table[[Period,1,2,3,4,5,6,7,8,9,10,11,12],[Houns,

0-4

,

4-8

,

8-12

,

12-16

,

16-20

,

20-24

,

24-28

,

28-32

,

32-36

,

36-40

,

40-44

,

44-48


We have an Answer from Expert

View Expert Answer

Expert Answer


We have an Answer from Expert

Buy This Answer $5

Place Order

We Provide Services Across The Globe