(Solved): Task 4: High-voltage permit-to-work 4 Two of the excavations were underneath high-voltage overhead ...



Task 4: High-voltage permit-to-work 4 Two of the excavations were underneath high-voltage overhead power lines. The electricity supplier was able to isolate these lines. A high-voltage permit-to-work would be required (see supporting document 1 (SD1)). What sections would you add to the permit, to further minimise risk?